Our overarching themes continue to be:
- Reducing our carbon footprint/Green IT
- Improving the Student Experience
- Reducing complexity
- Improving Resilience
- Doing more with less
Learning and teaching
2010
– MOLE 2 (our new VLE based on Blackboard Learn 9) Pilot
– Common Timetabling Pilot
– Learning and Teaching Space improvements
2011/12
– MOLE 2 – implementation
– Common Timetable Pilot (again)
– New managed student desktop based on Windows 7
– Piloting teaching with laptops to make better use of lab spaces
– Satisfaction survey of all students / Survey students about mobile devices
Research and Innovation
2010
– Support for Computer Simulation using graphical processing units
– Central License Management
– Working together with Research Groups
2011/12
– Upgrade Iceberg (our High Performance Computer)
– Research Funding - URMS ( the University’s Research Management System that researchers use to cost funding bids) now automatically lets us know when about research submissions that have a heavy computing requirement.
– Better Research Data Storage and management - working with the Library to reduce the amount of data stored in inapprpriate ways, and to improve its life cycle management
Communication and Collaboration
2010
– Move to IP Telephony
– Improve Video Conferencing facilities including installation of another Access Grid
– Implemented Google mail and calendar for students
2011/12
– Develop an Enquirer and Applicant Portal
– Implement a new portal based on Liferay
– Implement Google Apps for Staff Google
– Implement a text messaging system
– Complete new Content Management System roll-out
Help and Support
2010
– Implemented Self Service and Live Support on Helpdesk
– Worked closely to improve links with IT Support in Faculties
– Wokred with departments to deliver targeted training, especially improved induction for staff
2011/12
– Upgrade SupportWorks (Helpdesk software) to a system supporting service management
– Develop Professional Services Strategic Liaison
– Review of Information Security policies and procedures
Corporate Information
2010
– SAP Upgrade
– Upgrade of CIS (student Information System) and CRM
– Implemented Student Attendance Monitoring
2011/12
– SAP upgrade continued - this is a long term project
– Statutory Items (HESA, UCAS, SLC, PBI, Payroll). Acronym City. Has to be done.
– Implement Online registration
Infrastructure
2010
– Resilience - server virtualisation, introduced new hardware for VMWare and moved major systems onto Solaris Zones. Improved network resilence by removing single points of failure, setting up dual paths round campus and using resilient load balancers
– Increased storage capacity
– Green IT - 5 year energy costs reduced from £500,000 to £150,000 due to server virtualisation
2011/12
– On and Off site Bandwidth increase / management - hoping to increase link to 10Gb and upgrade internal core to 10Gb
– Wireless
– Storage refresh (2012)
– Review how we currently provide file and print services
Business Activities
2010
– Managed 16 Major Projects
– Transport and Parking services relocated to Estates and Facilities Management
– Carried out several Print Audits
– University archive provided information for several high profile events including the visit og HM the Queen
2011/12
– Implement a managed staff printing service
– Review software licensing
– Venues:
- upgrade Octagon technical infrastructure, replace bleachers etc
- Drama Studio increasing support to academic activities
Phew - that's quite a list. On top of all of that we're continuing to introduce service management by developing and reviewing our change, incident and problem procedures; setting up Service Advisory groups to support our Service Strategy Board; reviewing our Business Continuity procuedure; developing a methodology for understanding the cost of our services. Last, but certainly not least, developing and investing in our staff.
No comments:
Post a Comment