Thursday 13 August 2015

Diamond progess

I was lucky enough to be shown round The Diamond again yesterday - it's really looking stunning now, and coming along well. We're in there sorting networks out and installings and imaging PCs.

The team are doing a great job, theres a lot of hardware to get in - look at this plan of just one floor and what we're installing.



Took some pictures, but thought I'd share some facts and figures with you first, which CiCS colleagues will recognise from an excellent presentation at a recent departmental meeting. As well as purpose built state of the art engineering labs, there'll be the following spaces we have an interest in:

9 Lecture Theatres - Seating up to 1680 students
4 Flexible Teaching Spaces - Seating up to 388 students
3 IT Lab Facilities - Seating up to 252 students

9 Open Plan/Silent Study Areas - Seating up to 513 students
9 Group Study Rooms - Seating up to 73 students
10 Breakout Rooms - Seating up to 90 people
Virtual Reality Lab & Flight Simulator

Creative Media Facilities including:
  8 Media Booths
  TV Studio
  Large Media Editing Suite
  Small Media Editing Suite
  Large Range of Loanable Recording Equipment
  Open  24/7 with staff support 9-5

Quite a range of incredible spaces!  There'll be 20 data cabinets in it, over 3.500 data outlets and nearly 200 wireless access points.

So - the latest pictures;

View across the atrium to the spiral staircase and one of the pods


One of our study areas


The Electronics Lab

 

Looking over a pod to St George's Church


One of the computer rooms showing the installed PCs


..and the number of boxes we have to get rid of





1 comment:

EverQueer said...

Greatt reading your post