Showing posts with label incident. Show all posts
Showing posts with label incident. Show all posts

Thursday, 28 January 2016

Carnival time

Well, January is proving a bad month for blogging!  A number of reasons.....

I'm spending some time reviewing digital services at another University which has meant I've been there for 4 days this month. Always interesting to, to cast an eye over another places services. I can make suggestions, but they are of course only my personal opinions - and I learn a lot from them too.


I've also taken a few days leave. I had a bit of a significant birthday last Saturday -  I know, difficult to believe isn't it :-) and had hinted quite heavily that I didn't want to spend it in Sheffield. So, I spent it in Venice instead. Which was rather nice. Nice of the Venetians to open Carnival on my birthday as well.

Other things over the past week include further work on our planning statement, a meeting with a colleague as part of the Campus mentoring programme , and a review of a major incindent we suffered last week when we lost our internet connection for several hours due to two separate cable issues from our internet supplier. I was away from Sheffield at another University when it happened, and couldn't understand why I couldn't connect to our roaming wireless service, Eduroam. I rebooted my iPad, turned wifi off and on again, blamed the other institution....  Until I remembered how Eduroam works - it has to authenticate back at your home instittiton, which of course was unreachable... Another service we need to add to things we lose when our Janet link goes.   We're seriously considering how we can mitigate against these failures. We always thought that two links gave us enough redundancy, but now we're not that sure.

So, I'll leave you with a short video of the opening of Carnival - quite spectacular.




Thursday, 29 October 2015

Water feature in the IC

Yesterday I got a call to say that there was a flood in the Information Commons Yes, there had been heavy rain, but the University is on the top of a hill so I was a bit bemused....  When I got there I discovered that due to a problem with drainage, water had built up on the flat roof until it had overflowed, and we had what amounted to a waterfall water feature down one of the walls. It was really quite spectacular. I had been called not just because we jointly manage the facility, but because the Duty Manager wanted a standby incident manager. I'm one of the trained IMs for a major University incident, but after some discussion with the duty manager we decided it wasnt an mjor incident, but I would remain on standby and keep a watching brief. We went through our checklistsof who had been informed and needed to be involved - Health and Safety, Insurance, Comms, EFM, Cleaning, Library. And of course us - we needed to check that no equipment had been damaged - we were lucky that only a couple of PCs had been splashed, but we were more worried that water might have gathered under the floor and damaged our network cables. luckily it hadnt'!  The EFM team were great, climbed onto the roof and drained the water away until a drainage company arrived to clear the drains. Only part of the building had to be closed, and after a catch up nmeeting later inthe day, and inspection the following moring it was reopened.

Today we had a conference call with another University who are arranging a major incident simulation and wanted our advice on how to organise it - I think we were able to give them plenty. We've had a lot of practice recently!

Thursday, 22 October 2015

A testing time..

We take Business Continuity and Incident Management very seriously, and hold a major incident simulation annually. Today we had another - quite scary as usual - and although a group of us were asked to assemble at a particular time with no idea what would happen, we had a suspicion it would be based on a reputation incident rather than a physical one due to the presence of most of our comms team.

So, we arrived, and this was the calm before the storm....


After a short briefing we were off. Thank goodness I wasn't Incident Manager, but part of a standby team - in a separate room, waiting to be called. We were played a short radio clip, supposedly from Radio Sheffield about 4 students being arrested at dawn, supposedly from University accommodation, and not given much more information. NOTE  - THIS WAS A SIMULATION - IT DIDN'T REALLY HAPPEN.  Sorry about the shouting. Apparently simulations have been known to become real incidents when information has leaked and people haven't realised.  As well as the information we were drip fed, we also had a twitter feed to follow. Four members of CiCS had 10 fake twitter accounts with different profiles - students, staff, local resident, journalist etc - and tweeted from them from the duration of the incident. We had the incident team in one room, and the comms team in another. The whole thing was a test of how we would repond to an incident receiveing a lot of media and social media attention, when we had little information. I was late to be called, so I did what I would have done in real life, and stormed in asking what was going on :-)  Then I was asked to step outside (for a breath of fresh air) and was doorstepped by a BBC journalist complete with camera and microphone and had to give a live interview.

Later we had a press conference, with an elected spokesperson and a number of nasty journalists in the audience (including me).

It was very tiring, stressful, enjoyable, interesting - and a great test of how we might cope.  Somethings went really well, others could do with improving, but that's what it was for - to learn from.

Thursday, 9 July 2015

What to do if all your IT goes up in flames

Interesting session today about Business continuity and disaster recovery, focusing on the aftermath of the Crowmarsh Fire. Covers some theory and best practice around BC and DR, but I'll just focus on the Dr after the fire. A slightly scary story from the IT Manager for two small Local Authorities in South Oxfordshire.

The main services are provided by the LAs were waste collection, planning and building control, housing, food safety, council tax collection and benefit payments.

All services are shared between the two councils. All staff based in one place in Crowmarsh. Having recently relocated, and left a property which they now lease to Oxford City Council.
The IT department had 440 users. 1 main data centre with remote back up. Mostly on premise applications. Onsite back ups disk-disk-tape. Most Servers virtualised using VMWare. Most data stored on SAN technology. Some physical servers.

Om Thursday January 15. 2015, there was big fire at their location requiring 27 fire crews. Raged from 0330 till late afternoon, then reignited at night. A car loaded with gas bottles has been used in an arson attack. They effectively lost the whole building.

The story for the IT Manager....

Call from building manager at 3.30am to say building alight.
Took on role to raise senior management board and then initiate emergency plan.
Initiated the IT DR plan. Called suppliers to get plan started and equipment delivered. Had a contract with a company for hot standby. About a 4 hour lead time.
Made decision to use the building they had recently moved out of (Abbey House) where there had been a data centre. That had been identified in the plan.
Contacted BT to get numbers rerouted. That was also in their plan. Redirected to the switchboard in another building
Contacted IT team and relocated to them Abbey House.

Crisis management team had been set up including Senior Management, IT, HR, comms and members of emergency services. First meeting at 7am
Building had police cordon because no one knew why and if other buildings would be targeted
Back up tapes needed but there was only only one key to the safe which was on someone desk which had been destroyed in fire! Rang locksmith to break into safe. Had them before equipment had turned up

Existing infrastructure in building configured for use
DR plans checked so people know what to do
Equipment delivered to remote site by 11am
Set up equipment, rebuild of restore server.
Initial run of back up tapes, found problems with tape drive. Thought back up tapes were damaged :-(
Wasted several hours. But had been sent wrong type of tape drive. So had to get new one. But lost a day
Shared bandwidth with Oxford CC to get access to Internet and set up some temporary web sites

7pm, sent everyone home to rest.

Friday

New tape drive delivered and restores started.
Contacted key suppliers and asked for help where needed. Suppliers offered engineers etc. accepted all help.
Emergency laptops purchased to get frontline staff working. Housing staff especially as they dealt with vulnerable people, they used a hosted application. Bought Staff mobile phones.
Lot of laptops and mobiles lost in fire
Old XP machines used for temporary desktops.
Put up temporary web sites to give public information and key things they needed.

Saturday

Restore fully underway of key systems and data bases. Was an issue getting AD back
Had regular meetings of the team throughout the process
Migrated mail to Office 365. Needed to get mail working, was about to do it anyway so had licences, scripted process to automate user creation. Within 2 hours had fully functioning email system, through a browser. Didn't restore legacy system.
Building laptop image for use on Monday.
Live websites back up by Sunday night
Over weekend had an issues with available storage space for VMfarm.

Monday onwards

Limited number of desks, so only limited space, had to improvise!
Initiated VDI project to replace desktops. Had a new desktop within a week. A week!!!
All system and data recovery completed by Wednesday.
Challenge then was to get rest of business working.
Buy buy buy, build, build build
bought New laptops, thin clients, replacement physical servers. Built new desktops and laptops
Issues.
  • Limited office space, staff had to work in rotas.
  • Expectation of people about how long it would take to recover, assumption it would just happen
  • Out of hours support for emergency changes, some providers didn't provide out of hours support.
Challenges
  • Needed to minimise impact on services to the public
  • Deliver major elections, largest set of elections for 30 years
  • Office accommodation for staff. Leased some space, brought some old buildings back into play
  • Communications to staff on what was happening, regular briefings in local town hall.
Where are they now?
  • Just moved into new offices
  • Still running on DR equipment.
  • Impact on projects, lots of delays

Lessons
  • Test your plans
  • Be prepared to change plans, eg move to office 365
  • Never assume anything, like there's a spare key!

Other points
Out of news after 2 days, so consider it. Success
25m insurance bill!
Video of damage, lot of damage not done by fire but water and smoke.
Had to do full data destruction process on all kit damaged

Really great case study.
.


Friday, 27 February 2015

Keep calm and call control...

Quick wrap up of things I've been doing this week.  As well as meeting Faculties, I've chaired a meeting of our Business Continuity Operations Group where we looked at a number things including how we respond to student occupations of our buildings, what emergency procedures the city has in place which might affect us, and a review of our major incident plan. We have a really good set of web pages about what to do in an incident, which everyone should be familiar with, and a neat little poster:




I've also taken part in a forum of Heads of Academic Departments and Director of Professional Services about how we should interact both with the University executive Board 9UEB), and with each other. Some very interesting discussions, and a general view that the current UEB/HoDS forum doesn't work well and can be improved. A set of recommendations will follow....

Finally, this morning I had a conference call with other members of the Steering Group for one of the JISC Co-Design projects which is looking improving the digital skills of staff in HE.   It's title is Building capability for new digital leadership, pedagogy and efficiency, and you can read more about it here. The project intends to provide clear guidance over what digital skills are required, and equip leaders and staff with the tools and resources they need to improve digital capability at a local or institutional level. This will cover all areas of the University - technology enhanced learning, Administrative processes, and research.



Tuesday, 27 January 2015

Students, Power and Excellence

On an early train to London at the moment on route to JISC Stakeholder meeting, more on that later.

Yesterday was a real roller coaster day of meetings, I had 8! That will teach me to go away for a week.

In the morning I went to a consultation event with the Vice Chancellor and a good cross section of staff about our current review of our strategic plan, and the topic was The Student Experience. Some interesting presentation with some quite provocative ideas. By focusing on putting current students at the heart of everything, are we failing to meet the needs of other stakeholders, for example employers? Are we giving students what they want, rather than what they need? They want easy As, but they need a good education. What will the University of the future look like, and how will developments in technology change the way we teach?A very good session, with some excellent group discussions. One theme that emerged was the need to look at how we transition students from school to University, and also the need to radically review the way we teach to increase our flexibility to deal with non standard students and courses, which are increasingly becoming standard.

As well as updates on projects for which I am sponsor, I also caught up on an incident last week, where some electrical work caused us to loose power to one of our data centres. Because of the nature of the fault, the generator didn't kick in, correctly, so we ran on our UPS for 40 minutes, which had 3 minutes left when colleagues got the power restored. I think we can class that as a near miss.

Recently we launched our Customer Service Strategy which comes out of a lot of work we did last year within the department. Looking at the results of our recent staff survey, it's obvious that we do provide excellent customer service in some areas, but as in all things, there is always some room for improvement, and that's what we'll be working on this year.




- Posted using BlogPress from my iPad

Friday, 17 October 2014

Anonymous hack, or do they?

Yesterday I took part in some training for University Incident Managers in how to handle the media if you're in the middle of an incident. I'm one of about 10 people who are trained to handle a University major incident, and although we wouldn't expect to be key spokespeople, we might be expected to give some sort of interview, and there's always the chance we could be "doorstepped".

Although the day was fun, and we had lots of laughs in our small group of 5, it was also very scary, mainly because it was so realistic! It was run by two professional broadcast journalists, and we had to take part in interviews which were recorded and then played back and pulled apart. It didn't help that the "incident" was an IT security one, so I got very special treatment!  First up we were given a briefing that there were reports that "Anonymous" had hacked our system and published lots of data - usernames and passwords, sensitive research information, credit card details - anything you could think of that you wouldn't want published. With only a small amount of information we had to do a TV interview where we were asked very probing questions.  We all did it and it was then played back and we analysed how we'd all done. As the IT Director, to the opening question 'this is a very worrying situation isn't it?", I answered "Yes, it is a very worrying situation". Of course it would have been for me (in real life I would have been considering whether to resign or not....), but it was completely the wrong answer. I'm pleased to say I recovered eventually. After lots of discussion we did two more interviews - a "down the line" one, where you are in one studio and the interviewer is somewhere else. And a simulated live radio interview on BBC Figve live with a very aggressive presenter which was really tough. My opening question was "are you going to resign?"

Of course, the scenario eventually played out to reveal that there had been no major security breach, and that what had happened was that a departmental site developed by an academic, outside of our central systems had been compromised. There had been a data breach, but it had been contained and our central systems had remained secure. Totally fictitious of course...
An excellent day, and I do feel better prepared to face the media. As long as I can remember to slow down, and not say "Absolutely"

Thursday, 16 October 2014

You're fired....

First thing we did this week was have a review meeting of how we had handled the major incident last week when we lost our network connection. We do this after all of our incidents, looking at what we did well, and where we can learn and improve things. Although this wasn't actually our issue, we did review how we communicated internally and externally, and whether there were any measures we could put in pace to mitigate against the effect of any similar incidents in the future. We identified several things which we'll be putting into effect over the coming weeks.

I went with an Assistant Director on a visit to  Newcastle University on Tuesday to look at how they handle IT Support in their Faculties. They are a very similar University to us, and it was good to see how they do it, and what we can learn from them.

Yesterday I spent some time in a workshop looking at equality and diversity issues - if you're a long time reader of this blog you'll know I've been a member of the University Equality and Diversity Board for some time, and have been working for the last couple of years on objectives for the University. I firmly believe that diversity is extremely important, and its not just about box ticking and achieving targets - it's about embedding the culture in everything we do.  We discussed so much yesterday - including what is the education rationale for diversity? Why should we do it? Will it make a difference to our students and staff?  How can we recruit staff differently to ensure that we appoint from a diverse pool - something that I fear we don't do well at the moment for staff on grades one to five. there was lots of energy in the discussion, lots of ideas, and lots of things to take forward. For me, one of the key rationales for diversity, is that a diverse team is more creative, solves problems quicker, gets the right answers and is much more successful. You've only got to watch The Apprentice to see what happens when you put a group of similar people into a team....

Friday, 10 October 2014

Incidents are like buses.....

...they all come at once. Problem early Tuesday morning, then the major network incident on Tuesday - which we found out the primary cause of:


That's the reason we are so nervous of any building work around our campus!

Then today we woke up to discover we had no incoming or outgoing phone lines! Our supplier had suffered a major power outage which was affecting most of Sheffield. So, in early for another incident team meeting.  Not a lot we could do apart from get the message out, although we did make sure our control centre had a couple of working lines. All back on now, but apparently still at risk. Now where have I heard that recently?

In between incident teams, I have managed to get to some other meetings, including our Professional Service executive where we had a great presetnation from our Student sabbatical officers about their priorities for the year. Some really great ones including:
looking at the attainment gap for BME students (very appropriate for our diversity agenda)
looking at different methods of teaching and learning - reimagining education
creating more opportunities for students to take part in sport, especially as part of treatment for stress related illnesses
creating a sustainable campus. Building on initiatives such as Sheffield on a plate, the local fruit and veg market now held in the student union, and the student allotment society. They have ideas for more food growing areas around campus.

Of course we have our own new garden at the back of our offices which this year has yielded potatoes, runner beans, courgettes, tomatoes, peas, herbs and hopefully some pumpkins. Next year we're aiming for much more, including strawberries.


Monday, 30 September 2013

Start of term.....

After a morning of meetings, Friday lunchtime was spent celebrating the 50th Anniversary of our Information School. Founded in 1963 as a Postgraduate School of Librarianship with only 3 full time staff, it's now one of an international group of world leading iSchools. There were staff and students there from almost every year of the school - great to see some faces from the past.

I spent some of the weekend working on the Mobile University - a great event of about 30 mini lectures delivered on a vintage bus. The sun shone, and it was very popular with some lectures packed, both on the bus and in the tent where we had the overflow.  We even had deckchairs!


Today started with a Business Continuity Operational Group, where we discussed Business Impact Assessments, Evacuation procedures and a debrief of a recent incident involving a fire!

Today we had a visit from a facilitator who'll be working with us on an awayday for our Service Strategy Board in a few weeks. Discussed what we might cover, and what we wanted to get out of it.

And, we dealt with an incident, (which still has people working on it now as I type this) where we had to take a system down for a while because of performance problems. Unfortunately, it still isn't quite right.  System interruptions are thankfully rare, but when they happen they are very disruptive, especially on the first day of term. I'm really grateful to the people who work so hard trying to deal with them, from the people trying to fix them to the ones dealing with our staff and students.

Thursday, 29 August 2013

Back to work, again

Hi folks - I'm back, and have just logged into blogger to find my last post stuck as a draft - hence it only just being published. You must have wondered where I'd gone :-)   Whitby was fantastic, in case you're wondering. If you're really interested you can read about it on my personal blog. This year you're not getting the obligatory morris dancing photo, but one of the cottage we used to stay in a few years ago. Or rather, where the cottage used to be - lost to a landslide, and I must admit, many of the quaint cottages perched on the cliffs now look a bit unsafe to me...


So, back to work. This week has so far been about meeting the new Student Union officers - always a pleasure, looking at a number of HR matters, and dealing with an incident. For obvious reasons, can't say too much about it, but it involved three people thinking about it, one watching them, and a huge chocolate cake, which is out of shot!


Also had a good conversation this morning with a Gartner analyst about a workshop we're doing next week on service portfolios and service catalogues where we'll be reviewing our existing service catalogue and looking at how we might develop a portfolio. Should be interesting.





Tuesday, 13 August 2013

Still here....

Saying you're too busy to blog is a bit of a lame excuse really isn't it, but that's how it feels this week. Or is could of course be that I'm struggling to get back in the swing of it after a couple of weeks off. And, there's not been a lot happening to blog about - been busy with HR stuff and Finances mostly.

Had a good meeting at the end of last week with colleagues from JANET - talking mainly about changes happening in the JISC, and I'm pleased to see that Phil Richards from Loughborough has been appointed Chief Innovation Officer.  Will be interesting to see how innovation is taken forward. We touched on Janet6, the new Janet network - it's going very well, with many areas, including us, live already. We also took the opportunity to show off our creative media facilities, our producuction and edit suites and the equipment loan service.

This week I've had a conference call with a Gartner analyst about the draft  Digital Strategy which we are working with Corporate Affairs to implement. What became clear was our existing strategy is very much focused on marketing, and what we don't have is a University Digital Business Strategy. That's something that could be interesting to pull together. It would need to cover all of our business areas - Teaching and Learning, Research, Internationalisation, Civic Engagement, as well as operational areas.

The other thing that I've used a lot this week is HipChat - something we're trialling for use in incidents, and for having technical chats that twitter and other social media isn't appropriate for. Hosted off site so resilient, and private. Impressed with how it works so far. Not that impressed that I've had to use it, but that's another story :-)




Monday, 3 June 2013

Incidents and teenage birds

This morning I chaired a review of the major incident we had last Friday.  Something we always do - it's important to uncover what happened, and learn from any mistakes that have been made, look at what we can do better, and what worked well. In this particular case there are quire a few lessons to learn, around a number of aspects including our communication channels, incident procedures and change management processes.  We were piloting a new internal chat system, HipChat, when the incident happened, so it got a good test and it looks as though it will prove very useful.

We also had an Exec meeting where we looked at how we cover for the University Business Continuity Manager, (who is based in CiCS) if she is unavailable during an incident. As an Incident Manager I'm already trained in the major incident plan, and our three Assistant Directors are about to be so they they can also provide help and advice.

Finally tonight I went to a talk about the Peregrine falcons who are nesting on a platform on St George's Church and have hatched three chicks. The chair of the Sheffield Bird Study group gave a fascinating insight into these beautiful birds and their history. I hadn't realised how nearly wiped out they'd been by gamekeepers and pesticides, with only 385 pairs in the UK in 1961. Then we heard from our EFM department who had built and installed the platform - when originally constructed it had been on the opposite side of the church, due to concerns from the council about damage to the listed building, but after 20 months no bird had been near it. After permission had been gained to move it to its current position in 2011, the falcons landed on it straight away, and have been there on and off since. We also heard about the webcam, which was installed by EFM and we now look after the streaming. It's had over 280,000 hits from over 100 different countries. When the birds have flown, the platform will come down ( wouldn't like to go anywhere near it - it's disgusting at the moment), and be remade by AMRC from a composite material, and we'll also be looking at developing the webcam (s) for next year.

The chicks started off cute - now they look like teenagers - fairly dirty, messy, slightly gawky. I'm sure they'll be cute again when they've grown up - which apparently will only take a few more days. They're definitely getting interested in the outside world now, and see what I mean about the nest?




Friday, 18 January 2013

Let it snow....

Yesterday I was at a RUGIT meeting - IT Directors of the Russell Group Universities. We talked about a number of things, including setting up a couple of new Special Interest Groups - one on open access publishing, and one on research support.  We also had quite an interesting discussion about  strategies, and the different approaches taken. Some have traditional IT Strategies - usually 3-5 year rolling plans written by the IT department and mainly about central IT. Others, especially where all IT is run by one department, have whole University strategies. One had a quite short, infrastructure strategy written by the IT Department, with the rest contained in departmental plans. Here in sheffield we are developing strategies for our service areas, so we have a Teaching and Learning Support Strategy, a Research Support Strategy, one for Communication and Collaboration,  Help and Support, Corporate Information, Business Activity and Infrastructure.

Everyone seemed to be struggling with the same problem - too much to do and not enough resources. Too many requests for work coming in and unrealistic expectations of what we can cope with, and  how long it might take. We're not the only place having issues with prioritisation either, and a distinct lack of services that we can stop offering in order to develop and run new ones.

Today has mostly been about snow. As chair of BCOG, (Business Continuity Operational Group), I often end up coordinating the University's response to events such as bad weather. Today we were making sure that our snow clearing and gritting teams were prepared, we had communications for staff and students, and that we were prepared to get venues ready for exams over the weekend and next week. We have a great weather adviser from the met office who keeps us up to date with the latest predictions. As I write this, we've had light snow for a couple of hours, but nothing serious so far.

Signing off for a week now - my annual pilgrimage to Center Parcs for a birthday treat - lots of sitting in the hot tub drinking cocktails I hope, even if it snows.

Friday, 21 December 2012

Keep Calm and Call Control

A week of catch up meetings and Christmas lunches, including the infamous CiCS Christmas party. Photos will be posted as soon as I've decided where to host them!

Today we gave our customers some Christmas reading and published our newsletter, which you can download here.


The article on our new major incident plan caused some amusement, and a rather good mock up what a poster advertising it might look like was soon mocked up by one of our twitter readers (thanks James...).  Lots of good articles in there including ones on our new desktop, migration to our new VLE, information security, research computing and using Google Apps in teaching. We produce this about twice a year, and an email one every month. You can see all of our back copies here.

So, that's it for a couple of weeks. Have a very Happy Christmas and may you all have health, peace and happiness in the New Year. See you in 2013.

Tuesday, 11 December 2012

Space, SSB and George

Early start yesterday for a UEB/HoDS meeting (I should include a glossary shouldn't I - University Executive Board, Heads of Departments). One of the main discussion items was Space. I have to resist the temptation to always add The Final Frontier.  Specifically teaching space. Have we got enough, do we need to use it better?
Lots of data provided, including the different patterns of teaching (Monday mornings and Friday afternoons aren't popular), and the number of rooms booked which aren't used.  Discussions centred around how we can change our systems to improve efficiency of use, and what cultures need to change. Lots of very constructive discussion ranging from central timetabling to extending the teaching day. Lots more discussion to come as we cannot keep building more space.

Also yesterday we had a Business Continuity Steering Group where we  had a demo of our new Incident Contacts system, and a debrief of the incident simulation of a couple of weeks ago. Some headlines coming out of it include the need for "sub plans" to have in case of an incident - how do we evacuate a building safely without using fire alarms for example, or how do we cancel and rearrange exams. 

Then yesterday afternoon was our Service Strategy Board. As usual, a full meeting. In fact all meetings yesterday were full, not one less than two hours. But, all useful and interesting. SSB had a presentation on our Incident Procedure which has been revamped. Some of the key points to come out of the discussion included:
  • Front line support are a vital part of the process. We need to integrate the helpdesk and service catalogue, and complete our  Service Level Agreements (SLA's).
  • We discussed target resolution time for typical low-medium-high level problems which will be in the SLAs
  • We're introducing more regular reporting on incidents and the following reviews
  • One of the major areas of discussion was around out of hours incidents which are often the hardest to manage. Our new  incident contact database will help but we do have an issue with customer expectations of  24/7 suppor.
  • Major incidents will continue to be  handled by a team, with an identified incident co-ordinator, working with the University incident management plan as appropriate. 
  • We also noted that the Service Manager for the area is key to strategic decisions and needs to be involved in all incident teams.
A good discussion and the revised plan will now be subject to further consultation before being finalised in the New Year when we'll start a period of training and awareness raising. 

Lots of other good stuff in the Service Managers highlight reports and project progress documents. I was pleased to note the continuing success of the creative media suite in the IC, and a recent session for 40 students in the production of creative media was fully booked within hours. You can read about in the IC blog here.
We looked at several new project proposals and approved one of them - which can be summarised as Getting out of uSpace  (uSpace is our collaboration software which we hope to be out of by end of next year).  Others will be subject to further discussion and prioritisation.

And the most exciting thing to happen yesterday - I adopted a new cat. George. He's huge and furry. Does he look like a maine coon to anyone?







Wednesday, 5 December 2012

epiGenesys Showcase

On Monday i went to the 5th anniversary and student showcase of epiGenesys. epiGenesys is a business set up by the University's department of Computer Science in late 2007. It's wholly owned by the University, employing Sheffield graduates and giving  experience to current students on IT projects for businesses and charities, as well as ourselves. It's a great set up and has been hugely successful. We saw some really interesting projects, including a secure way of storing committee papers and displaying them on an iPad, a bibliographic search tool for researchers, a web interface to local hospital radio for patients and relatives to make requests and a PAT testing system. There were lots more, but I didn't have time to get round them all. A great venture, and something we are becoming more involved with - to mutual benefit I hope. We are commissioning epiGenesys to write systems for us, and I hope we will be able to give students some experience of what it's like to work in a large, enterprise organisation.

One of the systems epiGenesys has been working with us on is our incident contacts system, which we are piloting at the moment. Updatable by individual staff who've been nominated by their department to be incident contacts, it gives a nice clean search interfaces for our security staff to find contacts by name, department, building, role etc. The project group met this morning, and we're hopeful that after the pilot departments have reported we can roll it out across the University.




Friday, 28 September 2012

Major incidents..

Sorry, not many updates this week - lots of HR stuff going on,  that I can't really blog about.  However, yesterday was fairly exciting. A bit scary but exciting.   Spent 5 hours in a training session for incident managers. These are the people who will manage a major incident, so it's quite a responsibility. we looked at how incidents are reported, assessed and declared, and the things that should immediately be covered by an IM. Some of the exercises we did included how we would respond to a duty manager contacting us at 2am on a Saturday to report and incident, and as was pointed out to us many times, the clock is already ticking. At that time on a Saturday you could be anywhere (I've been phoned in the middle of a field), or in any state!

 One of the biggest recent changes in incident management is in communication. We no longer control the reporting or the messages. Chances are that any incident will be reported on Twitter, Facebook or other forms of social media before we know about it. News and rumours spread quickly. Citizen journalists are everywhere, and we just have to deal with it.

Anyway, I'm now the proud owner of the Incident managers handbook, and this is definitely one thing you hope you never have to use!

Monday, 9 May 2011

Services, projects, liaison

Strategic liaison with the Faculty of Engineering this morning. We used our planning statement as the basis of the agenda, particularly our objectives for the coming year. Under Learning and Teaching we reported on the upgrade to our VLE, and also a lot of work which is happening over the summer to improve the teaching  infrastructure, especially the wireless network. Lots of things happening in the provision of learning and teaching spaces as well, with refurbishments being planned for University House which will include some flexible learning space, and the development of the Learning Hub which will bring a number of student skills support together. We also talked about the planning Engineering are involved in for some major capital developments which  will provide some very innovative and shared teaching spaces.  The main topic under Research and Innovation was research data management, and some work we are doing jointly with the Library and R&I services to come up with practical solutions and advice for researchers.  The biggest topic under Communication and Collaboration was our move to Google Apps, which is currently going very well.  Well over half of our staff accounts moved, and very few problems encountered. And we got some very positive and complimentary comments about our staff who have been helping departments with the move.

This afternoon we had Service Strategy Board where we receive reports from our Service Advisory Groups (which have just started meeting), our service managers, and our project managers. Always a very full meeting, with a lot of useful discussion. No new projects today, which is a good job, as we are struggling in some areas to delver the ones we have. Some projects on hold to allow us to concentrate on the ones where we have a tight deadline, such as the Enquirer and Applicant Portal where we have to deliver it for our new students who will be coming in September. Some good progress on many projects though. We also had a look at a revised Incident Management Policy, which is the sort of document you hope you never need, but if past experience is anything to go by..........

Tuesday, 22 February 2011

Strange server names can cause confusion

Exec meeting yesterday morning- one of the main things we discussed was Business Continuity and incident issues. The possibility of more student unrest and  industrial action by staff, no matter what your political alignment might be, give us management issues which we need to think about in advance and have plans for. And as well as possible incidents, there's always real ones to deal with!  Last week a planned change to our DNS was followed by something falling over  - live solaris zones? a solaris cluster?  - not sure of the terminology, but it was Bad.  As usual, I was away (often am when Bad Things Happen) so they were able to deal with it without me interfering. However, yesterday when the same machines decided to have another unscheduled rest, I was here, so I could interfere. That usually consists of me wandering into the infrastructure team's office and asking silly questions like, Do you know what's happened?, and Can you fix it? Sometimes I look at screens knowledgeably and listen, although you can hear some strange things, like "Pussygalore's not responding". I'm hoping it's the name of a server...

So, another incident review this afternoon where we'll be doing the usual what went wrong, how can we deal with it, what lessons have we learned etc.

Later in the afternoon we met with an academic department to discuss some service and operational issues they'd raised with us.  I like to get out into departments, but it doesn't happen as often I'd like - things are always easier to discuss and resolve face to face.

This morning spent mainly catching up, reading emails and notes of meetings, and some new blog posts. You might remember me discussing an institutional review of twitter in Russell Group Universities which Brian Kelly had posted about on his blog. Now the study has been repeated, but looking at the 1994 Group of Universities.  Wide range of results, with some Universities making more use of it than others. Not had chance to see if there's any significant differences between the two groups yet, but there's some useful data there for people managing institutional twitter accounts.